Upcoming Events

  • Sun 18-2-24 @ 14.03 - Knockout Semi & Final
  • Fri 8-3-24 @ 12.15 - Province Bonspiel
  • Sat 8-3-24 @ 15.00 Waldie Griffith v Angus at Murrayfield
  • Sat 23-3-24 @ 11.30 Waldie Griffith v Angus at Forfar
  • Website last updated 29-1-24

Tuesday 7 March 2017

CURL EDINBURGH APPEAL

CURL EDINBURGH 2018 APPEAL

The Curl Edinburgh 2018 Appeal recently kicked off with great interest and curiosity from our members! The appeal is looking to raise funds for essential modernisations of our curling facility.
The detailed plan, prepared in conjunction with architects, structural engineers, costs consultants, and others, was set out at a launch event last month. In brief, it schedules work in three phases to coincide with our off seasons. The sequence of work is still being confirmed, however the modernisation includes:
  • a new concrete cooling floor,
  • recladding the elevations,
  • energy efficient lighting,
  • the creation of an additional floor above the plant room, and
  • doubling the size of the viewing gallery
The project will be funded by a combination of cash reserves, grants, loans, and donations.
More than 30 years ago, a previous generation of Edinburgh curlers dug deep to ensure the continuation of curling in Edinburgh. Now, it is our turn. We are certain we can meet this challenge and emerge with a modern and efficient facility of which we can all be proud!
Donation forms are available at the bar or in the office or download a copy here. Send in your donation today!

A Closer Look

Phase 1
Planning consent has been secured for Phase 1 of construction. During the first phase of the project, the following will be undertaken:
  • Insulating the curling rink walls
  • Installing energy-efficient LED lighting
  • Modernisation of scoreboards and ice hall décor

Phase 2
Phase 2 includes the critical replacement of the curling floor:
  • Replace the aging concrete cooling floor
  • Install new flow and return headers
  • Construct foundations to allow for the Phase 3 extension of the first floor viewing area

Phase 3
The final phase of the project will ensure that we control our own destiny and are not at risk of losing communal gathering space. The construction will include:
  • A better-integrated bar and viewing area
  • New office space and roof plant area above the existing plant room
  • A DDA-compliant passenger lift
  • Toilet provision on the first floor

Want to learn more? You can view and download the original launch presentation online:

Launch Presentation

No comments:

Post a Comment